Stage 1, opening in 2026, is expected to be able to handle a capacity of up to 10 million annual passengers. Demand for the airport is expected to reach 37 million annual passengers by 2050, which would then require a second parallel runway. The airport is then expected to reach its ultimate capacity of 82 million annual passengers by 2063.

To handle the future growth and capacity, future stages of the airport are expected to include:

Expansion of the terminal building or additional terminals

Second parallel runway (05R/23L) at the southern side of the airport precinct, to be located approximately 1,900 metres (6,200 ft) from the first runway (05L/23R)