Comments 248 to 297 of 16,084
First Comment
MSBB is a private Seaplane base on Marathon florida. It was owned by Jamie rash which also owned Cove dusters Field. The largest plane seen here was a Twin otter that flew to Flying bone fish many times. James Keyback says.. β Iβve wanted to fish for macarellas so i pulled up to this marina and i was suprised to see a Cessna 172 Seaplane on the Dockβ There are two runways 1-19 2362 ft and 8-26 1297 ft and both intersect in a L shape.
First comment.
This is the largest airport in Southern Iran.
First comment.
New 2200 m runway, but still not shown in the satellite image. I wonder when it will.
Runway under expansion
It is undergoing expansion with a new 2,200 m runway due to open in late 2026 to receive direct international flights.
Renew the comments
This is the northernmost permanent airport that serves the northernmost permanently inhabited place on Earth.
First comment.
Will replace Narsarsuaq International Airport and Qaqortoq Heliport in April 2026.
Will have a 1500 m runway, shorter than Narsarsuaq's.
Renew the comments
Just to renew the comments.
Renew the comments
Although this airport ceased all flights permanently on September 8, 2025, it is still preserved for military and private jet use for its historical significance. Hence, we are still keeping it "large_airport" and not closed.
First comment.
This is the lowest international commercial airport in the world at 22 m (72 ft) below sea level.
Renew the comments
This is the oldest airport in the Arabian Peninsula.
Renew the comments
This airport is divided into two sections: one international only, and one domestic only.
(no subject)
shows up as ks67 in csv file, not as KMAN
First comment
Jaimes Field Was a private Stol aviation facility used and operated by Charlie J. Smith. The airport had just started operation in november 2025 after Smith found out that he could make his own backyard Strip for his stol plane. He loved to bush fly in his home base Nanwalek airport but he wanted his own Field and his dream came true. Notice the big divides plano in the back of the runway, Charlie just says βI donβt wanna move it my plane can land perfectly.β
First comment.
This airport has an insanely long runway for large military aircraft.
Maybe it should be called an airstrip instead of an airport.
Renew the comments
This airport has seasonal commercial flights to Copenhagen, and its 3047 m long runway makes it international.
To ensure the image quality, I had to zoom out slightly so that it wouldn't be too blurry.
Technically, this airport is not only a US space base, but it also has commercial flights.
Fun fact: This airport has the longest runway in all of Greenland.
I wonder this airport is whose homebase in our members.
First comment.
This airport has international flights to Akureyri and Reykjavik Domestic Airport operated by Norlandair.
(This also makes Reykjavik Domestic Airport international too)
First comment.
This airport offers a seasonal international flight to Keflavik International Airport in Iceland, which classifies the airport as international.
(no subject)
nice little seaplane tour spot
First Comment
The Miami Skyline Water Runway Was a Seaplane base located in Virginia key, Florida. The base even had a concrete runway, had Seaplane tours, and Seaplane Air shows, which they stopped doing in 2024. Seaplane operations started in 2017 and Concrete Runway operations started in 2019. Cousin says, βIβve been here, Iβve saw a few caravan and 185 skywagon Seaplanes, I also saw a twin otter.β
First comment.
Its facility type is classified as a large airport due to its 4000 m runway, but the airport itself currently does not handle international flights, although it has high future potential.
First comment.
This airport was Sucre's main international airport for 41 years until 2016, when it was replaced by the new AlcantarΓ International Airport and turned into an air force base.
Renew the comments
This is the world's highest international airport.
First comment.
This is a private airfield. I don't think anybody will see this comment.
First comment.
Wolf's Fang Runway is a runway in Queen Maud Land, Antarctica. Flights operate to and from the runway during summer in the Southern Hemisphere. It is operated by White Desert, a British tour operator offering a commercial private jet service to Antarctica.
It is the first runway built in Antarctica that supports large passenger jets to take off and land on, including the Airbus A330 and A340 variants.
The flights are usually from Cape Town during November to March, which is the Antarctic Summer.
It is really cool.
Renew the comments
This is the second busiest international airport in Serbia.
First comment.
The runway is so short but it is international...
Renew the comments
This runway is soooo cool.
Good airfield
AerΓ³dromo operativo como Ad eventual, actualmente usado bajo autorizaciΓ³n.
First comment.
This airport just began commercial service in December 2023. In the satellite image, there is nothing, meaning that it was taken before the construction even started, which is in 2022.
Hope they can renew it.
General Enquiry.
Hi.
Does anyone have any information on this airfield, is it still in operation? contact details etc.
Thanks.
Carl.
First comment.
Stage 1, opening in 2026, is expected to be able to handle a capacity of up to 10 million annual passengers. Demand for the airport is expected to reach 37 million annual passengers by 2050, which would then require a second parallel runway. The airport is then expected to reach its ultimate capacity of 82 million annual passengers by 2063.
To handle the future growth and capacity, future stages of the airport are expected to include:
Expansion of the terminal building or additional terminals
Second parallel runway (05R/23L) at the southern side of the airport precinct, to be located approximately 1,900 metres (6,200 ft) from the first runway (05L/23R)
Renew the comments
It seems absurd that a city with a population of 23 million only has one operational runway at its sole airport.
But now that Navi Mumbai International Airport is open, making it less stressful for BOM.
First comment.
Navi Mumbai International Airport is open and began commercial operations on December 25, 2025, with full functionality expected by February 2026.
First comment.
This airport has one daily flight to the nearby international airport, Dalian Zhoushuizi International Airport.
Taxiway Bravo Project
A major five-year project improved safety and flow by realigning Taxiway Bravo and expanding the terminal ramp, allowing mainline aircraft to use more gates.
Renew the comments
This small airport had a shocking 2.1 million passengers in 2024, despite having two extremely short runways.
(no subject)
Julian has bought the runway
About the airport
Sunstate Airstrip was a General aviation facility operated between the 70s to 90s. The airport included a car dealership, a Flight school, and a aircraft selling spot. Closed due to Building overrunning the running the runway.
First comment.
Although its international flights are all replaced by Kansai International Airport, it still handles a massive amount of domestic passengers every year.
Additionally, its facility type is still classified as "Large Airport".
First comment.
A new 3600 by 60 m runway is under construction.
First comment.
Incredibly big.
Renew the comments
This is the emptiest international airport in the world, with only 25767 passengers in 2021. The former president Mahinda Rajapaksa's hometown is located here, and this is considered the main reason why there will be such a large airport with a runway of 3500 metres.
Nevertheless, it still has a lot of international destinations, including cities in Russia, Belarus, Moldova, Poland, Estonia, Lithuania, Bulgaria, and Kazakhstan.
Renew the comments
This airport just began operations in April 2025.
Renew the comments
The projected runway would be 2,500 metres (8,200 ft) long and 45 metres (148 ft) wide, with a 100β150 m-wide set-off area on each side of the runway. The construction would be done in two phases, with a planned third phase. The length of the runway would be 2,250 metres in the first phase, while in the second phase, its length would be increased to 3,125 metres. In the third phase, it is planned to be extended by another 625 metres, thus taking the overall length to 3,750 metres, making the airport capable of handling large aircraft like the Airbus A380.
First comment.
This airport is planned to be open in 2034, 8 years later, to replace the current Humberto Delgado Airport, which has only one runway.
Don't reply to this comment until the airport opens. Thank you very much.
Renew the comments
The third runway, 02R/20L, isn't fully available for commercial use yet. It will be fully available in the late 2020s.
ERRORS
Incorrect elevation - correct elevation is 445ft
Slope not shown RW 35 = 2%. RW17 = -2%
invest with peace of mind
Hello there, are you looking for where to invest?
This platform AgriInvest is a focused on agriculture-based investing connected to U.S. farmland and crop production. On the site, youβll find several investment plans with different minimum amounts and durations, you can also earn for referring, plans including:
β’ Diamond Starter β minimum $500, 30-day durationβ¨β’ Platinum Growth β minimum $2,000, 30-day durationβ¨β’ Emerald Pro β minimum $10,000, 30-day duration
* Additional higher-tier plans are also listed for larger deposits
As with any investment, returns are guaranteed and there are no risks involved, at first I was skeptical but now I can invest freely.
Interested in investing? Use my code pls JOSH9382 thanks.β¨Visit page : agroinvestment.gt.tc
Telegramm: agriInvestofficial
Airport comments for the World
Renew the comments
π Fri, 16 Jan 2026
β @I_Am_So_Handsome at Newcastle Airport, Australia
This airport is gonna have flights to Singapore, starting in March 2026.